Services | Safety Awards | Brochure | Neglecting Cooling  | Brochure | Presentation
References | Contact Us | Employment | Home
Click to enter

Preventing Tomorrow’s Problems Today

Thermal Upgrading

(225) 545-4100


E-Mail : KCampesi@CEMail.cc
The most important factor in evaluating performance is the proper proportioning of air and water. All components should be designed for maximum air movement through the fill area at the lowest horsepower requirement.

CTTI can evaluate your tower on a total system approach that assures you all the parts work together for the greatest total performance.
Upgrading a tower to reach its greatest performance potential can be influenced by several factors: the present tower must be able to carry the increased load; the structure of the present tower must be acceptable; the dimensions of the present tower must be proportionate to the increased load; and the cost of a thermal upgrade should be less than building a new tower.

CTTI understands your needs and we can repair your towers with minimum down time. We take great pride in solving your cooling tower problems.

CTTI is always looking for a competitve edge in order to better meet your needs. One example, of this dedication is our patented Stur-D Span Splash Fill. Please contact CTTI to find out more.
Cooling Tower Technologies
(225) 545-4100               E-Mail : KCampesi@CEMail.cc
Services | Safety Awards | Brochure | Neglecting Cooling  | Brochure | Presentation
References | Contact Us | Employment | Home